- The tiler has grouted the main bathroom.
- The carpenter has installed 3 doors to downstairs wet areas.
- The timber floor installers (aka my dad and brother) have completed the sunspace/walkway upstairs.
- The painter (aka my man!!!) has completed spray priming the cornices downstairs :)
I promise to upload the photos soon. I really need a decent camera as I am finding it really difficult to capture the real colour of tiles with both my iPhone and point and shoot :(
Hope you are all having a lovely weekend :)
B
No comments:
Post a Comment